Project experience

Selected NETICO projects

A selection of delivered infrastructure and building-services work from 1997 onward.

15 selected projects

Projects are grouped by their principal technical scope.

Fire Protection · 1997

Camille Chamoun Sports City, Bir Hassan

Supervised installation and commissioning of an NFPA 20-compliant, UL/FM fire-fighting system rated at 2,500 GPM and 8 bar, including diesel and electric drives, jockey pump, valves, and controls.

Fire Protection · 2003

Le Royal Hotel, Dbayeh

Delivered high- and low-pressure fire-fighting systems for two pressure zones, including UL/FM pumps, diesel standby, pressure maintenance, control panels, data logging, and pressure controls.

HVAC & Controls · 1998–1999

Bahman Hospital

Designed, supplied, supervised, and commissioned chilled-water pumps, control valves, and automated switchgear for alternating rotating equipment.

Water Infrastructure · 2002

Doha Aramoun Pump Station & Reservoirs

Delivered a multistage pump station, water-hammer protection, large diaphragm tank, flow controls, valves, fabricated piping, coating, testing, and commissioning.

Water & Wastewater · 2004

Lebanese University, Hadath Campus

Delivered campus water production, distribution, and utilities systems including deep-well pumps, split-case cold-water pumps, manifolds, lift stations, and motorized flow controls.

HVAC & Fire Protection · 2001–2002

Zahle Hospital

Designed and delivered HVAC systems, control valves, split-case pumps, and electrical controls through testing and commissioning.

Potable Water · 1998

Mechref Community Infrastructure

Supported potable-water storage and distribution networks with PE piping, valves, joints, air release, construction management, supervision, and handover.

Wastewater · 2002

Saida Wastewater Treatment Plant

Supplied and installed lift-station equipment, ductile-iron piping and fittings, puddle flanges, stainless-steel screens, and accessories.

Wastewater · 2003

Tripoli Wastewater Treatment Plant

Supplied wastewater fittings, puddle flanges, air-release valves, and accessories with installation supervision and startup.

Potable Water · 2003

Deir El Qamar Infrastructure Works

Supplied, supervised, and commissioned a potable-water system with pipes, fittings, house connections, buried valves, manhole covers, hydraulic controls, and air release.

Water Transmission · 2002

North Bekaa–Hermel Infrastructure

Supplied 13 km of ductile-iron transmission and distribution piping with fittings, valves, house-connection components, and accessories.

Fire Protection · 2003

American University of Beirut

Delivered an NFPA 20-compliant, UL/FM 500 GPM fire-pump system with diesel, electric, and jockey pumps, listed valves, and controllers.

HVAC & Fire Protection · 2001

Crowne Plaza Beirut

Delivered chilled-water pumps and valves plus an UL/FM 750 GPM fire-fighting system through installation and commissioning.

Automation & Control · 2001

Hazmieh Water Supply Automation

Supplied and commissioned pneumatic butterfly control valves up to 900 mm and related piping accessories for water-system automation.

Water Infrastructure · 2003

Daichounieh Water Supply Wells

Supplied large-diameter butterfly and knife-gate valves, piping, and air-release valves with supervision, testing, and commissioning.